Ningbo Airport Terminals
Ningbo Airport has two terminals, however only Terminal 2 is fully operative.
terminal 1
The old terminal. It was closed after the put on operation Terminal 2.
Terminal 2
Terminal 2 was put into operation on December 2019 and since then, all flights are being handled from that Terminal.